https://www.polity.org.za
Deepening Democracy through Access to Information
Home / Statements RSS ← Back
Africa|Coal|Energy|Eskom|generation|Nuclear|Power|Projects|Renewable Energy|Renewable-Energy|Resources|SECURITY|Solar|Sustainable|Power Generation|Power-generation
Africa|Coal|Energy|Eskom|generation|Nuclear|Power|Projects|Renewable Energy|Renewable-Energy|Resources|SECURITY|Solar|Sustainable|Power Generation|Power-generation
africa|coal|energy|eskom|generation|nuclear|power|projects|renewable-energy|renewable-energy-company|resources|security|solar|sustainable|power-generation|power-generation-industry-term
Close

Email this article

separate emails by commas, maximum limit of 4 addresses

Sponsored by

Close

Article Enquiry

Cabinet now complicit in Mantashe’s failure to table updated Integrated Resource Plan

Close

Embed Video

Cabinet now complicit in Mantashe’s failure to table updated Integrated Resource Plan

Image of Minister of Mineral Resources and Energy, Gwede Mantashe
Minister of Mineral Resources and Energy, Gwede Mantashe

20th October 2023

ARTICLE ENQUIRY      SAVE THIS ARTICLE      EMAIL THIS ARTICLE

Font size: -+

/ MEDIA STATEMENT / The content on this page is not written by Polity.org.za, but is supplied by third parties. This content does not constitute news reporting by Polity.org.za.

The repeated failure by the Minister of Mineral Resources and Energy, Gwede Mantashe, to table an updated Integrated Resource Plan (IRP) has been enabled by the indifference of his Cabinet comrades who have failed to hold him to account for stalling South Africa’s energy policy. President Cyril Ramaphosa’s Cabinet should now bear collective responsibility for creating policy uncertainty on energy security at a time when the country is going through an economy-stunting electricity crisis.

Mantashe has missed several self-imposed deadlines to release an updated IRP, a failure for which he has faced no real consequences. The lethargic approach by Mantashe towards a new IRP is hardly surprising – he has made it his life mission to stall South Africa’s adoption of a renewable energy fueled future. He is aware that a credible IRP should place greater emphasis on renewable energy and enable and expedite a just energy transition, something which is at variance with his avowed preference for fossil fuels.

Advertisement

Without an updated IRP, South Africa will be forced to continue relying on the outdated energy assumptions of IRP 2019 that do not reflect what must be done to address the ongoing electricity crisis. It boggles the mind that Ramaphosa has been quick to establish a national crisis committee and energy task teams but has failed to show the same zeal in expediting South Africa’s electricity generation roadmap through the IRP.

Failure to produce an updated IRP has exposed the misplaced priorities of the Cabinet. On one hand they regularly call for increased private sector investment in the energy sector and the transmission grid, yet on the other they are failing to provide the necessary policy certainty to guide these investments. It confirms the widely held view that the ANC government has become the single largest impediment and obstacle to energy security in South Africa.

Advertisement

The DA holds the brief that an updated IRP should reflect South Africa’s current energy realities and projected energy demands
by:

1. Increasing projections on electricity that can be generated from renewable energy sources to reflect increasing capacity from IPPs who have been approved in all the bid windows;
2. Changing baseline assumptions on baseload from coal and nuclear towards renewable energy sources and dispatchable batteries;
3. Institutionalising rooftop solar as a key source of embedded power generation;
4. Opening up the energy generation market from a single seller to a multi-seller dispensation to facilitate competition and price rationalisation; and
5. Increasing investment in grid capacity to support IPP projects.

Even with lack of policy clarity at national level, DA run governments have taken the lead in implementing key interventions to address loadshedding. The City of Cape Town is the leading metro in South Africa that has facilitated the rapid expansion of embedded generation at household and businesses. In a few years' time, most DA-run municipalities will be free from the failing Eskom monopoly and set on a firm path towards a sustainable energy future.

 

Issued by Kevin Mileham MP - DA Shadow Minister of Energy

EMAIL THIS ARTICLE      SAVE THIS ARTICLE ARTICLE ENQUIRY

To subscribe email subscriptions@creamermedia.co.za or click here
To advertise email advertising@creamermedia.co.za or click here

Comment Guidelines

 

About

Polity.org.za is a product of Creamer Media.
www.creamermedia.co.za

Other Creamer Media Products include:
Engineering News
Mining Weekly
Research Channel Africa

Read more

Subscriptions

We offer a variety of subscriptions to our Magazine, Website, PDF Reports and our photo library.

Subscriptions are available via the Creamer Media Store.

View store

Advertise

Advertising on Polity.org.za is an effective way to build and consolidate a company's profile among clients and prospective clients. Email advertising@creamermedia.co.za

View options
Free daily email newsletter Register Now