https://www.polity.org.za
Deepening Democracy through Access to Information
Home / News / All News RSS ← Back
Power
Power
power
Close

Email this article

separate emails by commas, maximum limit of 4 addresses

Sponsored by

Close

Article Enquiry

Load-shedding jumps to Stage 4

Close

Embed Video

Load-shedding jumps to Stage 4

Eskom building
Photo by Bloomberg

19th April 2022

By: News24Wire

SAVE THIS ARTICLE      EMAIL THIS ARTICLE

Font size: -+

Eskom has announced that load-shedding has immediately jumped to Stage 4 on Tuesday morning after more generation units failed. 

The power utility said the jump from Stage 2 happened at 7:20 after Majuba Unit 5 and Tutuka Unit 4 tripped. 

Advertisement

Eskom did not say when the load-shedding will end. A statement is expected to be released soon with more details.

CEO Andre de Ruyter is also scheduled to brief the media at 10:00 on the state of the grid. 

Advertisement

Eskom initially started with overnight Stage 2 load-shedding early last week, before more unit failures at various power stations led to full-time shedding until Friday morning. There was a slight reprieve until Sunday, when Stage 2 was needed again. 

EMAIL THIS ARTICLE      SAVE THIS ARTICLE

To subscribe email subscriptions@creamermedia.co.za or click here
To advertise email advertising@creamermedia.co.za or click here

Comment Guidelines

About

Polity.org.za is a product of Creamer Media.
www.creamermedia.co.za

Other Creamer Media Products include:
Engineering News
Mining Weekly
Research Channel Africa

Read more

Subscriptions

We offer a variety of subscriptions to our Magazine, Website, PDF Reports and our photo library.

Subscriptions are available via the Creamer Media Store.

View store

Advertise

Advertising on Polity.org.za is an effective way to build and consolidate a company's profile among clients and prospective clients. Email advertising@creamermedia.co.za

View options
Free daily email newsletter Register Now