https://www.polity.org.za
Deepening Democracy through Access to Information
Home / News / South African News RSS ← Back
Power|System|Maintenance
Power|System|Maintenance
power|system|maintenance
Close

Email this article

separate emails by commas, maximum limit of 4 addresses

Sponsored by

Close

Article Enquiry

Load-shedding suspended from Saturday

Close

Embed Video

Load-shedding suspended from Saturday

Lightbulb
Photo by Bloomberg

22nd July 2022

By: News24Wire

SAVE THIS ARTICLE      EMAIL THIS ARTICLE

Font size: -+

Stage 1 load-shedding will be implemented from 16:00 to 24:00 on Friday evening.

Load-shedding will then be suspended as the generation system has recovered sufficiently at this point.

Advertisement

"Eskom thanks the public and all stakeholders for their patience and understanding during this difficult period of load-shedding. While we are able to suspend load-shedding at this point, Eskom cautions that the power system constraints continue to persist," Eskom said in a statement.

Eskom has 3 693MW on planned maintenance, while another 14 261MW of capacity is unavailable due to breakdowns.

Advertisement

EMAIL THIS ARTICLE      SAVE THIS ARTICLE

To subscribe email subscriptions@creamermedia.co.za or click here
To advertise email advertising@creamermedia.co.za or click here

Comment Guidelines

About

Polity.org.za is a product of Creamer Media.
www.creamermedia.co.za

Other Creamer Media Products include:
Engineering News
Mining Weekly
Research Channel Africa

Read more

Subscriptions

We offer a variety of subscriptions to our Magazine, Website, PDF Reports and our photo library.

Subscriptions are available via the Creamer Media Store.

View store

Advertise

Advertising on Polity.org.za is an effective way to build and consolidate a company's profile among clients and prospective clients. Email advertising@creamermedia.co.za

View options
Free daily email newsletter Register Now